Project-confirmed Specification
A parameter that should not be published as fixed because it depends on bottle data, mold scope, line layout or engineering confirmation.
Ask the quotation to record the bottle, mold and utility assumptions behind each provisional value. Confirm the final output, fit or utility requirement in writing before using it for purchase or factory planning.
RFQ checks
Send bottle drawings, material, target output, mold scope and destination before engineering compares the machine and mold route.
- Move from product route to the bottle data needed for engineering review.
- Send bottle drawings, material, target output, mold scope and destination before price comparison.
- Bottle volume, neck finish and sample photo or drawing.
- Target output and material route: PET, PP, PETG, Tritan or PPSU.
- Preferred machine model, mold cavity target and destination country.
- Mold only, machine only or complete line scope.
- Move from generic catalog browsing to project examples, comparison tables and RFQ checklists.
- Standardize bottle, preform, mold, output and auxiliary data before the first quotation.
- Compare route fit, data confidence and next steps before sales replies to the RFQ.