Input RFQ
- Botol capacity dan dosing/cap rute
- Neck finish dan sealing surface
- Material dan cleanliness expectations
- Target output dan sampel approval plan
program botol obat harus start with neck finish, repeatability target, rute material dan clean handling requirements before mesin selection.
Medicine botol RFQs biasanya membutuhkan stronger neck, sealing dan repeatability checks, not only botol volume dan output.
Yes. Cetakan precision, cavity rute dan mesin constraints harus be checked before final tooling approval.
Send gambar botol or sampel, neck finish, material, output target, cap rute dan any cleanliness or sampel acceptance requirements.
Kirim gambar botol, material, target output, cakupan cetakan, dan negara tujuan terlebih dahulu. Engineering kemudian dapat memetakan rute mesin dan rute tooling sebelum harga.